Underwater Inspection

USAN UWILD & Mooring Survey

Technical Brief

Under contract with ExxonMobil, Dovaheights Energy Ltd. delivers recurring subsea asset integrity and underwater survey operations for the USAN FPSO and offshore loading buoy off the coast of Nigeria. Executed under strict Bureau Veritas (BV) class supervision, the multi-disciplinary scope includes hull cleaning, mooring chain inspection and diameter gauging, valve functionality testing, and Cathodic Protection (CP) monitoring to ensure continuous class compliance and operational readiness.

Project Summary

Our recurring subsea asset integrity services deliver comprehensive subsea inspection for both FPSO units and buoys, ensuring strict class compliance and continuous field reliability. The scope encompasses General Visual Inspection (GVI) and Close Visual Inspection (CVI) of hull structures, appurtenances, critical welds, and mooring chain systems, backed by targeted marine growth cleaning for accurate defect detection. To safeguard structural longevity, we conduct high-precision Cathodic Protection (CP) potential field measurements and thorough sacrificial anode depletion checks across all offshore assets.

FPSO

  • Hull & Weld Integrity: General Visual Inspection (GVI) and Close Visual Inspection (CVI) of the FPSO hull plating, structural appurtenances, and critical welds.
  • Marine Growth Removal: Specialized marine growth cleaning to facilitate close-up visual and structural weld assessments.
  • Mooring System Surveys: Comprehensive GVI and CVI of FPSO mooring chains, fairleads, and line connectors.
  • Cathodic Protection & Anodes: Cathodic Protection (CP) potential measurements and detailed sacrificial anode depletion assessments.

BUOY

  • Buoy Hull & Appurtenances: GVI and CVI of the buoy hull structure, internal/external appurtenances, and weld integrity.
  • Bio-Fouling Removal: Marine growth cleaning across underwater buoy surfaces to ensure accurate visual inspection.
  • Buoy Mooring Line Surveys: GVI and CVI of buoy top-chains, excursion limits, and chain connectors.
  • Corrosion Assessment: CP field potential surveys and complete anode condition checks.

Technical Details

Primary Equipment

Videoray Defender ROV

Maximum operating Depth

300 metres.

Mission duration

45 operational days.

Platform Type

FPSO/Buoy

Class society

Bureau Veritas

Require Similar Expertise

Our engineering teams are ready to discuss the technical requirements of your next subsea installation or maintenance campaign.

Get in Touch