Photogrammetry

Bonga 3D Photogrammetry

Technical Brief

Performed underwater inspection, cleaning, and 3D photogrammetry of 11 riser flexjoints on the Bonga FPSO for SNEPCo. The project provided detailed digital asset models and condition assessment data to support offshore asset integrity and maintenance planning.

Project Summary

Delivered advanced 3D Photogrammetry and Subsea Inspection Services on the Bonga FPSO for SNEPCo, including inspection, cleaning, and high-resolution 3D digital modelling of 11 riser flexjoints. The project supported asset integrity assessment, condition monitoring, and maintenance planning for critical subsea infrastructure.

FPSO

  • Conducted General Visual Inspection (GVI) of 11 FPSO riser flexjoints to assess structural condition and operational integrity.
  • Performed subsea cleaning of 11 riser flexjoints to remove marine growth and improve inspection visibility.
  • Executed high-resolution 3D photogrammetry surveys of riser flexjoints for detailed asset condition assessment and digital documentation.
  • Developed accurate 3D subsea models to support engineering analysis and integrity management programs.
  • Identified signs of wear, corrosion, and mechanical degradation on critical FPSO riser infrastructure.
  • Utilized advanced underwater photogrammetry technology to enhance inspection accuracy and reporting quality.
  • Supported proactive maintenance planning through comprehensive subsea inspection and digital asset mapping.
  • Delivered specialized inspection solutions for offshore oil and gas production assets.

Technical Details

Primary Equipment

Videoray Defender ROV

Maximum operating Depth

300 metres.

Mission duration

25 operational days.

Platform Type

FPSO

Class society

Lloyd’s Register

Require Similar Expertise

Our engineering teams are ready to discuss the technical requirements of your next subsea installation or maintenance campaign.

Get in Touch