In-Water Inspection

ERHA In-water Inspection

Technical Brief

Underwater FPSO inspection services including OLL inspection, FlexJoint assessment, hull connection inspection, and subsea GVI surveys to 50m depth. Supporting offshore oil and gas asset integrity, maintenance planning, and operational safety.

Project Summary

Performed comprehensive underwater inspection services on the ExxonMobil FPSO, including detailed inspection of Offloading Loading Lines (OLLs), FlexJoints, and hull connection points. Scope also covered General Visual Inspection (GVI) of OLL infrastructure to depths of 50 meters subsea, supporting asset integrity verification and offshore operational safety.

FPSO

  • Conducted underwater inspection of ExxonMobil FPSO subsea assets, ensuring structural integrity and operational reliability.
  • Performed detailed inspection of Offloading Loading Lines (OLLs), identifying potential defects, wear, and integrity concerns.
  • Executed comprehensive FlexJoint inspection services to assess connection stability and asset performance.
  • Carried out subsea inspection of FPSO hull connection systems, supporting offshore asset integrity management.
  • Completed General Visual Inspection (GVI) of OLLs to water depths of 50 meters, providing critical condition assessment data.
  • Delivered high-quality underwater asset inspection and integrity verification for FPSO production infrastructure.
  • Supported proactive maintenance planning through detailed subsea inspection and condition monitoring activities.
  • Ensured compliance with offshore inspection standards through accurate documentation of underwater observations.

Technical Details

Primary Equipment

Videoray Defender ROV

Maximum operating Depth

300 metres.

Mission duration

Platform Type

FPSO

Class society

DNV

Require Similar Expertise

Our engineering teams are ready to discuss the technical requirements of your next subsea installation or maintenance campaign.

Get in Touch